| Public Meeting #2
October 4, 2007
7:00 pm- 9:00 pm
Hope United Methodist Church
244 Wicks Lane, Billings
The purpose of this meeting was to review the preliminary
alternatives for the Billings Bypass EIS. Preliminary alternatives were
developed based on public and agency input during the initial stage
of the project. Community input collected at Public Meeting #2 will
contribute to the refinement of the alternatives that will be carried
forward for detailed evaluation in the EIS. Materials presented at Public
Meeting #2 can be downloaded below:
View a summary of Public Meeting #2:
Public Meeting # 2 Summary (44 KB)
Handouts provided at the meeting:
Agenda and Project Handout (3.5 MB)
Comment Sheet (143 KB)
The meeting was an open house format with displays on the following
three topics:
Station #1 – Project History, National Environmental Policy Act
(NEPA) Process and Project Schedule
Feasibility Study (2.0 MB)
Purpose and Need (10.8 MB)
Design Objectives (4.9 MB)
Project Flow and Timeline (751 KB)
Station #2 – Existing Conditions
Study Area (9.0 MB)
Opportunities and Constraints (8.0 MB)
Existing and Projected Congested Routes
in Billings (383 KB)
Station #3 – Alternatives
Typical Sections (239 KB)
Screening Process (97 KB)
Initial Alignments (29.6 MB)
Level 1 Screening (6.4 MB) – This
graphic describes the outcomes of Level 1 Screening; text in the graphic
refers to the “Initial Alignments” graphic available for
download above.
Conceptual Alternatives (31.8
MB)
Level 2 Screening (6.5 MB) – This
graphic describes the outcomes of Level 2 Screening; text in the graphic
refers to the “Conceptual Alternatives” graphic available
for download above.
Preliminary Alternatives (29.6
MB)
EIS Evaluation (4.4 MB)
Next Steps (3.1 MB)
Warning - due to file sizes, loading time may be slow. The materials
are provided in Portable Document Format. You must have Adobe Acrobat
Reader to download these files. You can download the reader for free
by clicking on the Adobe Acrobat icon below.

|